tailing dam
基本解释
- 尾矿坝
英汉例句
- Among the factors affecting the safety of upstream method-tailing dam the seepage field is one of the most important.
影响上游法尾矿坝安全的各种因素中,渗流场是极为重要的因素之一。 - The results indicated that the safety factor meet regulatory requirements, and Zhelamujing tailing dam is stable under 8-degree earthquake.
分析得出安全系数满足规范要求,者拉母箐尾矿坝在8度地震作用下是稳定的。 - After assuring the slope stability, we study the vegetation choice and the recovery vegetation, derive the project procedure and the technical key of recovery vegetation in the tailing-dam.
在边坡稳定性得到保证之后,对边坡的植被选择和复垦技术进行了研究,得出了进行尾矿坝复垦的工程步骤和技术要点。
双语例句
词组短语
- tailing -dam 尾矿坝
- Tailing Filling Dam 尾矿坝
- Changpo tailing mine dam 长坡尾矿坝
- tailing dam security 尾矿库安全
- construction of tailing dam 尾矿筑坝
短语
专业释义
- 尾矿坝
Li Xi tailing dam will be liquefied partly, might enable dam come down in earthquake.
栗西尾矿坝在地震过程中局部发生液化,可能使坝体产生滑坡。 - 尾矿库
The tailing dam is designed with height of 185m, which is the second high-central line tailing dams in our country. In this paper, tailing dam engineering is set as research object.
本文以该尾矿库工程为研究对象,采用室内试验和数值模拟技术,对中线法高堆坝在地震作用下的动力响应特性进行了系统研究。