burnable poison assembly
常见例句
- Early studies analyzed using the WIMSSN system had large errors in fuel assembly analyses with burnable poison (BP).
用WIMS- SN系統計算含可燃毒物組件時,出現比較大的誤差,不適宜低溫供熱堆含可燃毒物組件的計算。 - This paper introduces the improved NHR 10 core design which includes the arrangement of the gadolinium burnable poison (BP), the fuel assembly arrangement and the fuel assembly reloading scheme.
介紹了NHR- 10組件內釓可燃毒物配置、堆芯燃料組件佈置和換料方案的改進設計。 返回 burnable poison assembly