boring tower
基本解释
- 钻塔;钻架
英汉例句
- The boring tower is arranged on the unilateral cantilever survey platform.
钻塔,设于单侧悬臂勘探平台 上;
ip.com - Owing to the change of operating condition and serious water bearing in crude oil, the top of atmospheric tower is corroded and boring.
因操作条件变化和原油带水严重,造成常压塔顶部塔壁腐蚀穿孔。 - The equipment, comprising the boring tower inside the working area cantilever side and the slurry pumps on the boat body, is arranged on the survey platform.
设备,设于勘探平台上,包括位于工作区悬臂侧内的钻机和位于船体上的泥浆泵。
ip.com
双语例句
专业释义
- 钻塔
- 钻塔