boring tower
基本解释
- 鑽塔;鑽架
英汉例句
- The boring tower is arranged on the unilateral cantilever survey platform.
鑽塔,設於單側懸臂勘探平台 上;
ip.com - Owing to the change of operating condition and serious water bearing in crude oil, the top of atmospheric tower is corroded and boring.
因操作條件變化和原油帶水嚴重,造成常壓塔頂部塔壁腐蝕穿孔。 - The equipment, comprising the boring tower inside the working area cantilever side and the slurry pumps on the boat body, is arranged on the survey platform.
設備,設於勘探平台上,包括位於工作區懸臂側內的鑽機和位於船躰上的泥漿泵。
ip.com
雙語例句
专业释义
- 鑽塔
- 鑽塔